Transitional arrangements
Contents |
[edit] Update as of March 14, 2024
The Building Safety Regulator (BSR) has extended the deadline for registration of Building Control inspectors until 6 July.
Director of Building Safety for the Health and Safety Executive (HSE), Philip White, wrote on 14 March to the Building Control industry outlining new transitional arrangements for the registration of Building Control inspectors in England.
In Wales, the deadline has been extended until 1 October 2024.
Registered building inspectors are a new role created under the Building Safety Act 2022. They will be empowered to issue compliance notices and stop notices for higher-risk buildings during any stage of the design and construction process.
White wrote in his letter that Building Control professionals who had not yet completed a competence assessment can take advantage of the deadline extension provided they meet the following criteria:
- They are an existing Building Control professional;
- They are registered as a Class 1 Registered Building Inspector (RBI) by 6 April 2024;
- They are enrolled in, and in the process of having their competency assessed through, one of the BSR-approved competency assessment schemes by 6 April 2024; and
A scheme provider has not told them that they have not passed their competency assessment for a second time.
For more details, please visit the Making Buildings Safer website.
[edit] Definiton
Transitional arrangements are defined in the Government guidance "Eligibility for transitional arrangements in building control" updated March 11, 2024.
Transitinal arrangemants are described as allowing projects to stay under the existing building control regime – and avoid transfer to the Building Safety Regulator (BSR). Which means eligible projects can stay under the old rules. Though developers must take the required steps for their projects to qualify.
[edit] Details
If a project had building control arrangements established before October 1st, 2023, and has made substantial progress before April 6th, 2024, it qualifies for transitional provisions. A notice of sufficient progress must be given to the local authority in order to qualify
As such under these provisions, a project can continue to be regulated by the existing building control provider. This will require the building control provider to be appropriately registered with the BSR. In order to benefit from transitional arrangements, it is essential that notice is given to the relevant local authority, indicating that the building work has progressed sufficiently.
For the construction of a higher-risk buildings, sufficient progress means when pouring concrete for the permanent placement of foundations or piling has started. For work on existing buildings, this means when any work has begun. There is no specific rule for what counts as starting work, but it usually includes any significant building activity mentioned in the project application.
If the project involves an Approved Inspector (AI), a copy of this notice must also be goven to the AI as well. Failure to send notice to the local authority will result in the project transferring to the BSR.
Projects must use a suitably Registered Building Inspector (RBI) and suitable building control arrangements to continue benefitting from the transitional arrangements. Suitable building control arrangements means submitting full plans to the local authority. The plans must not be rejected. Or it means giving an initial notice to the local authority. The authority must accept the notice.
[edit] Related articles on Designing Buildings
- Building a safer future: proposals for reform of the building safety regulatory system.
- Building a Safer Future, Independent Review of Building Regulations and Fire Safety: Final Report.
- Building safety
- Building safety act 2022
- Building safety case.
- Building Safety Charter.
- Building safety certificate.
- Building safety in Wales.
- Building Safety Manager.
- Building Safety Regulator
- CIAT raises concerns about Building Safety Bill.
- CIOB reviews the Building Safety Bill.
- Competent person.
- Fire inspector.
- Fire Safety Act.
- Fire safety design.
- Fire Safety Order.
- Fire (Scotland) Act 2005.
- Golden thread.
- Grenfell articles.
- Hackitt Review.
- Health and safety for building design and construction.
- Health and safety plan.
- New Regulations published under Building Safety Act
- Reform of building safety standards.
- Risk assessment.
- Safety audit.
- Safety briefing.
- Safety management.
- The Building Safety Bill - A Quality Response.
- The Building Safety Bill and product testing.
- The Building Safety Bill, regulations and competence.
- The golden thread and BS 8644-1.
- What is a hazard?
- UK building control regime under the new Building Safety Act regulations
Featured articles and news
Tackle the decline in Welsh electrical apprenticeships
ECA calls on political parties 100 days to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.